SMUD – Franklin Substation

SMUD Franklin Substation includes ground-up construction of a 230kV Greenfield substation consisting of an 8,000 sf, two-story control building. The control building incorporates heavy building material such as high-strength CMU concrete footings, elevated decks and structural steel to provide tie-in points to site electrical cable trenches and housing for all control equipment.

CLIENT

Sacramento Municipal Utility District (SMUD)

ARCHITECT

Cynthia Easton Architects

FOOTPRINT

800,000